Ohio County Schools Bond Project Updates
In partnership with Ohio County Schools, McKinley Architecture and Engineering has launched a Bond Updates page.
The following is a summary schedule for projects taking place in 2019, along with others scheduled to begin in 2020 and 2021.
It is important to keep in mind that the design and planning for each of the bond projects begins before actual construction.
The design phase includes programming, schematic design, design development, construction documents, and state reviews for
approval. We look forward to providing updates to this page on the status of OCS bond projects.
To learn more about McKinley Architecture and Engineering's capabilities and accomplishments, please click here.
Click here to send Ohio County Schools your feedback.
To learn more about McKinley Architecture and Engineering's capabilities and accomplishments, please click here.
Click here to send Ohio County Schools your feedback.
Ritchie Elementary School Renovation |
---|
Upgrade site fencing, and parking and playground areas; additional exterior safety/security enhancements; ceiling, flooring, and window replacements; HVAC systems upgrade in 1976 addition; fire alarm upgrades; and repairs to drinking fountains and swimming pool |
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Steenrod Elementary School Roof Replacement |
---|
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Elm Grove Elementary School Roof Replacement |
---|
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Triadelphia Middle School Bleacher Replacement |
---|
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Wheeling Middle School Bleacher Replacement |
---|
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Wheeling Park High School Bleacher Replacement |
---|
Status Completed In Progress Construction Begins (Anticipated) |
View Media |
Madison Elementary School Renovation |
---|
Improve drop-off area; upgrade bus loading zone and site fencing, and parking and playground areas; additional exterior safety/security enhancements and lighting; replacements of exterior door and windows; restoration of building exterior; security/accessibility entrance renovation; code compliance renovations to kitchen; interior accessibility improvements; classroom renovations; flooring, window, and roof replacements; HVAC systems upgrade; and fire alarm and sprinkler systems upgrades |
Status Completed In Progress Construction Begins (Anticipated)May 2019 |
View Media |
Bridge Street Middle School Renovation |
---|
Safety and security renovations to upgrade visitor access and parking; reconfigure circulation to relocate entry to original front entry; repairs to address water infiltration, add exterior safety/security lighting, corrections and replacements to interior doors & hardware; renovations to enhance music curriculum; ceiling, flooring, window, and roof replacements; HVAC systems upgrade; and new sprinkler system |
Status Completed In Progress Construction Begins (Anticipated)May 2019 |
View Media |
Status Completed In Progress Construction Begins (Anticipated)May 2019 |
Triadelphia Middle School Addition and Renovation |
---|
Add safety/security lighting; addition to original 1917 school to replace existing 1922 annex and related improvements; new site stair between adjacent elementary and school; classroom renovations to repurpose spaces; flooring, ceiling, and roof replacements; HVAC systems upgrade; and bleacher replacement |
Status Construction In Progress Completion (Anticipated) |
View Media |
Steenrod Elementary School Addition and Renovation |
---|
Improve drop-off area; upgrade bus loading zone and parking areas; kitchen/cafeteria addition; additional exterior safety/security enhancements and lighting; security entrance renovation; repair interior doors & hardware; classroom renovations; flooring, window, and roof replacements; and HVAC and electrical systems upgrade |
Status Construction In Progress Completion (Anticipated) |
View Media |
West Liberty Elementary School Renovation |
---|
Add safety/security lighting; classroom renovations; security entrance renovation; repairs to building exterior; improvements to interior door hardware; flooring, ceiling, and window replacements; concrete slab corrections; HVAC systems upgrade; and bleacher replacement |
Status Construction In Progress Completion (Anticipated) |
View Media |
Wheeling Park High School Addition and Renovation |
---|
Add safety/security lighting; slop repairs at track; add artificial turf to existing field; restroom addition to track complex; upgrade softball field; security entrance addition; administration area renovations; performing arts areas renovations and addition; media center renovations; science lab renovations; improvements to food service areas; upgrades to career and technical education (CTE) equipment; locker room renovations; selective slab corrections; flooring, roofing, window, exterior overhead door, ceiling and roof replacements; swimming pool equipment replacements; security and electrical systems upgrades; repair interior doors; HVAC systems upgrade; and bleacher replacement |
Status Construction In Progress Completion (Anticipated) |
View Media |
Woodsdale Elementary School Addition and Renovation |
---|
Kitchen/cafeteria renovation; upgrade drop-off area, bus loading zone and parking areas; security entrance renovation; improvements to interior doors and hardware; classroom renovations; selective repairs to building exterior; flooring, exterior door, and window replacements; and HVAC and electrical systems upgrades; |
Status Design In Progress Construction Begins (Anticipated)June 2021 |
Warwood School Renovation |
---|
Upgrade parking areas; add exterior safety/security lighting and other enhancements; security entrance renovation; flooring, ceiling, window, and roof replacements; improvements to interior doors & hardware, water damage and drinking fountains; electrical systems upgrade; new sprinkler system in elementary school portion of building; and HVAC systems upgrade |
Status Design In Progress Construction Begins (Anticipated)June 2021 |
Elm Grove Elementary School Addition and Renovation |
---|
Improve drop-off area; upgrade bus loading zone and site fencing, and parking and playground areas; additional exterior safety/security enhancements and lighting; renovation of security entrance, cafeteria and gymnasium; addition to replace spaces used for cafeteria and security entrance renovations; ceiling, flooring, window, and roof replacements; HVAC systems upgrade; and fire alarm and sprinkler systems upgrades |
Status Design In Progress Construction Begins (Anticipated)June 2021 |
Middle Creek Elementary School Addition and Renovation |
---|
Improve drop-off area; upgrade bus loading zone and site fencing, and parking and playground areas; additional exterior safety/security enhancements; renovation of security entrance, cafeteria and gymnasium; addition to replace spaces used for cafeteria and security entrance renovations; ceiling, flooring, window, and roof replacements; HVAC systems upgrade; and fire alarm and sprinkler systems upgrades |
Status Design In Progress Construction Begins (Anticipated)June 2021 |
Bethlehem Elementary School Renovation |
---|
Safety and security renovations to upgrade site fencing, reconfigure entry to add security vestibule, replace interior doors and hardware; ceiling, flooring, window, and roof replacements; HVAC systems upgrade; and new sprinkler system |
Status Design In Progress Construction Begins (Anticipated)June 2021 |
Wheeling Middle School Addition and Renovation |
---|
Construct addition connected to original 1977 school for security entrance, circulation (stair & elevator) to main floor level and administration area; upgrades to parking areas; exterior safety/security enhancements and lighting; classroom renovations; flooring, window, exterior doors, ceiling and roof replacements; HVAC and plumbing systems upgrade; and bleacher replacement |
Status Design In Progress Construction Begins (Anticipated)June 2021 |